Substations and grids, engineered to be built.
Grid connection engineering for solar, wind and storage developers: solution study, ATR support, substation design from 20 to 400 kV and energisation, handled by one team.

- 20–400 kV
- Voltage range in design and integration
- 3
- Engineering disciplines under one team
- 15
- Substations 110–400 kV in the team’s track record
A partnership between
- ISO 9001 · 14001 · 45001
- Parent group listed on BVB
What we do
Three disciplines, one engineering team.

From distribution to transmission,
20 to 400 kV.
- 20 kVMedium voltageDistribution substations and MV connections for generation and industry.
- 33 kVCollector networksCollector networks for wind and solar parks, and connections for large industrial sites.
- 110 kVHigh voltageHV substations, DSO grid connections and line bays.
- 220 kVTransmissionTransmission substations and transformer stations.
- 400 kVExtra-high voltageBackbone substations and grid interconnections.
Built for the people who build energy.
Plants from early layout to the substation and connection that make them bankable.




Why Alfa Protocol
Engineering that holds up on site.
A new company, built on the people and the industrial capacity of two established groups.
Integrated by design
Electrical, civil, automation and permitting handled as one system, not as separate packages.
Built for execution
Drawings checked against how the site will be built, before they leave the office.
Public-company discipline
Documentation and governance shaped by a group listed on the Bucharest Stock Exchange.
Local certifications, international standard
ANRE A3, E1 and E2 certifications, ANRE-authorised IVA/IVB staff and ISO 9001, 14001 and 45001 systems.

Selected team experience
Grid integration for the 44 MW Gătaia solar plant
- Scope
- Solution study, primary and secondary design
- Voltage
- 110 kV grid connection
- Capacity
- 44 MW
- Location
- Timiș, Romania
Questions developers ask us.
Short answers to what we hear most in first meetings. The technical glossary covers the terms behind them.
We design and integrate high-voltage energy infrastructure: substations from 20 to 400 kV, grid connections, solar and wind plants and battery storage, together with protection, SCADA, automation and permitting.
From 20 kV medium voltage to 400 kV extra-high voltage: distribution substations and MV connections, 33 kV collector networks for wind and solar parks, 110 kV substations and DSO connections, and 220 and 400 kV transmission substations and interconnections.
Yes. One team covers the solution study, support for the grid connection permit (ATR), primary and secondary design, permitting and site support up to energisation, so nothing is lost between stages.
Yes. We work in English and Romanian, design to Romanian grid codes and operator standards, and coordinate with developers, EPC contractors and equipment suppliers from other markets.
Alfa Protocol is a joint venture of New Protocol Group and Electroalfa International, an industrial group listed on the Bucharest Stock Exchange.
Send us the site, the planned capacity and the connection point, through the form on this page or at [email protected]. An engineer from our team will follow up to agree the scope and the next steps.
Bring us the project.
We will bring the engineering.
From early-stage development to complex grid infrastructure, our engineering team is ready to support your next project.